List of Homestead Actions
Fieldwork
When you use a tool to work the land, spend STA to complete your task and advance 1 week:
- Tilling: 1 STA to furrow 12 tiles of soil.
- Clearing flora: 1 STA to chop 4 trees or clear 12 tiles of brush.
- Digging: Up to 3 STA to dig 3 tiles of irrigation per STA spent.
- Sowing: 1 STA to sow 50 tiles with seed.
- Fertilizing: 1 STA to spread fertilizer on up to 50 tiles.
- Harvesting: Up to 3 STA to harvest 10 tiles of crop per STA spent.
Meeting with difficulty
When you meet with a situation at the homestead that is difficult, risky, or time-sensitive, roll 2d6 modified by the stat most relevant for the situation:
- Technique: Matters of skill, craftsmanship, or speed.
- Toughness: Matters of might, endurance, or physique.
- Intelligence: Matters of lore, knowledge, insight, or reasoning.
- Heart: Matters of connection, divinity, sociability, or emotion.
On a 10+, you get through it with as few consequences as you could have hoped. On a 7-9, you get through it but not without complication; pick the consequence below if its obvious, or else roll for one. On a 6-, the worst outcome comes to pass; at least two of the following or a similarly severe consequence takes place:
- You spend 1d4 STA.
- You take 1 Damage.
- You gain the feebled [-1 TEC], weary [-1 TOU], dazed [-1 INT], or miserable [-1 HEA] condition.
- A piece of property involved in the situation gets damaged (1 building, piece of gear, or field).
- Your bond with an NPC is lowered by 1.
- Your reputation with a local settlement is lowered by 1.
Construction
When you want to build a structure or improvement, set aside the necessary resources for the project and designate the area it will take up. Then, create a track equal to it's Construction Track stat. Every time you take the Construction action to work on a project (including the action used to set it up), spend up to 2d4 STA to increase its track by the STA spent. The project is finished once the track is filled. If you cancel the project at any point before it's done, you get back half of every kind of resource used, rounded down. The rest is lost.